Manufacturing

Get Involved. Join the Conversation.

Topic

    Dev Thota
    How to use manufacturing to create a PO with variable cost...
    Topic posted November 5, 2019 by Dev ThotaGold Trophy: 10,000+ Points, tagged Electronic Records and Signatures, Manufacturing MDM, Manufacturing Analytics, OTBI, Production Execution, Production Scheduling, Public Sector, Tip, White Paper, Work Execution, Work Request Management 
    31 Views, 1 Comment
    Title:
    How to use manufacturing to create a PO with variable cost for same work order quantity
    Summary:
    How to use manufacturing to create a PO with variable cost for same work order quantity
    Content:

    We are implementing fusion manufacturing and our business needs to have a variable amount PO with same work order quantity as shown in the attached screen shot. The RM cost will vary from one work order to another work order, is there any feature available to achieve this.

    Version:
    19C/19D
    Image:

    Comment

     

    • Rashmi Ranjan Mohanty

      Hi,

      This cannot be addressed through the outside processing feature. You may want to evaluate using the "Manually procure materials for work orders" feature that was introduced in 19A. You can review the readiness training to know more about this feature. The readiness training can be accessed through the following link:

      https://download.oracle.com/ocomdocs/global/apps_19A/scm/MFG_Manually_Procure_Materials/index.html