Field Service

Get Involved. Join the Conversation.

Topic

    Shailendra Vishwakarma
    Installation of material after sending validation of closure...
    Topic posted November 11, 2019 by Shailendra VishwakarmaGreen Ribbon: 100+ Points, tagged Configuration 
    13 Views
    Title:
    Installation of material after sending validation of closure Report
    Summary:
    Installation of material after sending validation of closure Report
    Content:

    is presented by the functional area in which they find locations with work orders where it is possible to install material after sending closure validation, when reviewing it is evidenced that this occurs when the same is worked parallel order with two different users, one is the technician user and the other is the dispatch supervisor user, it occurs while the property A_VALIDADOR_RESULT_CODE-code validating result in Sending is set in the manual_message step Step 2.B- Sending Validate Close. Video is attached where the situation is replicated.

     

    IS THERE ANY WAY FOR THAT PROPERTY TO BE SET IN LESS TIME, AS WE HAVE SEEN IT DOES IT IN 30 MINUTES, OR IF THERE IS ANOTHER WAY OF CONTROLLING THROUGH THE WEB INTERFACE EQUIPMENT IS NOT INSTALLED WHILE THE TECHNICIAN THIS MOBILE INTERFACE SENDING THE CLOSURE VALIDATION AND OBTAIN A CORRECT VALIDATION RESPONSE.

    Version:
    19C